Oil Rigs

Henry Goodrich

When the Henry Goodrich was to be placed in service on the Hibernia Oil Field of the Canadian East Coast in 1999, faulty gray and black water piping was discovered on board.  We received a request for assistance from Friede Goldman Newfoundland.  Due to time limitations, they needed a fast solution to this problem. 

Pacific Pipe & Pump was able to replace the entire sanitary system onboard in 25 days, using GEBERIT HDPE pipes and fittings.  Cost savings using GEBERIT HDPE pipes, compared to replacement with the existing system was almost 60 percent!

 

                   

Clogged Black water pipes

 